Skip to content
ATSPal
94.7% match with hiring experts

Hire smarter. Read every resume like a recruiter would, in minutes, not days.

ATS Pal is the screening layer your ATS doesn't have. Upload a job description and a stack of resumes; get a ranked shortlist with the reason behind every score, so you spend interview time on the right people.

94.7% Match with hiring experts
30s Per resume, in parallel
$0.04 Effective cost per resume
See it in action

From job description to ranked shortlist.

A glimpse of how a recruiter filters and reviews candidates against the actual requirements, with reasoning attached to every score.

ATS Pal portal: per-requirement filters and Pal Approved candidates in the results table
Live look at the recruiter view. Try it on resumes you've already screened →

Your ATS searches for keywords.
We evaluate the actual requirements, like an experienced recruiter does.

The reason great candidates get rejected isn't your team. It's keyword matching.

What changes for your team

Less time on rejections. More time on real interviews.

Three things shift the day you switch on screening that actually understands your requirements.

1

A shortlist you can defend

Every candidate gets a score with the reason behind it, which requirements they meet, which they miss, and where they're stretching. Hand it to your hiring manager without a follow-up meeting.

  • Per-requirement match per candidate
  • Sort and filter by anything
  • Export to CSV in one click
2

Hours back in your week

A typical recruiter spends 15-20 minutes scanning each resume manually. ATS Pal returns a ranked shortlist in roughly 30 seconds per resume, processed in parallel, so a 100-resume role becomes a coffee break.

  • 100 resumes in minutes, not days
  • Add more resumes anytime
  • Pick up where you left off
3

Pal Approved candidates, surfaced

Anyone who clears every must-have requirement gets the Pal Approved mark. Even if your filters are aggressive, those candidates stay visible, so you don't lose strong people to over-filtering.

  • Knockout-criteria check
  • Saved filter sets per role
  • Side-by-side comparison view
Evaluated by 78 HR professionals

What recruiters say after the first week.

We asked 78 recruiters and hiring managers to put ATS Pal against their own screening. These are their words - roles are real, names withheld.

Why I trust the score

Everyone knows how a standard ATS works, so candidates stuff their resume with keywords until they pass. We were wasting hours interviewing "top matches" who turned out to be polished resume writers, not strong engineers. ATSPAL evaluates what's actually behind the keywords. When it scores someone 94.7%, I trust that score.

Senior Talent Acquisition Lead - B2B SaaS scale-up

Upload and you're done

The biggest time-sink for me isn't reading resumes, it's hunting for the specific things our hiring manager asked for across 80 resumes in 12 different formats. ATSPAL reads the JD, extracts every requirement, and scores each resume against it automatically. I upload and the shortlist is ready. I can still drill in with my own filters when I want, but most weeks I don't need to.

Lead Recruiter - fintech

I can't go back to manual

I'll be honest: this is dangerous. I used it for one role and now I refuse to screen manually again. My boss asked me to test a competitor's tool last week, I couldn't do it without comparing back to ATSPAL. Once you see the per-requirement breakdown, you can't unsee it.

Recruiter - dev-roles agency

Hiring managers stopped pushing back

My job actually changed. I used to send shortlists and explain them in a follow-up call. Now I send the shortlist with reasoning attached and the hiring manager argues with the candidates, not with how I picked them. The conversations got 10× better.

People Lead - Series-B startup

One workflow, every language

Some of our roles are French-only, others English-only, and a few accept both. ATSPAL handles each without changing settings, same workflow, same scoring rigour, regardless of resume language. We stopped maintaining two screening processes.

Head of Talent - bilingual agency

340 applicants, 7 interviews

Posted a senior engineer role, got 340 applicants. I never opened a single resume cold. ATSPAL surfaced 18 candidates worth looking at, with reasons. I interviewed 7. We hired 2. The hours I would have spent screening went into talking to the people worth talking to.

Founding Recruiter - early-stage startup
We complement, we don't replace

Keep your ATS. We're the screening layer it doesn't have.

Your ATS collects applicants, schedules interviews, and tracks offers. That's its job. The thing it never solved is the part you actually dread: reading every resume and ranking them honestly. That's our job.

  • No migration, no IT involvement, no contract renegotiation
  • Try it on one role this week; integrate fully later if you like
  • Small team without an ATS? Run screening from here until you adopt one, we complement it later
Your ATS / job board Collects applicants from posting
ATS Pal screening Ranks against your real requirements with reasons
You interview The shortlist is defensible, back to your ATS for offer/onboarding

Works alongside the tools you already use

BambooHR
Greenhouse
Lever
Workable
Workday
Custom Webhook
Explore the ATS Bridge integrations →
Simple, predictable pricing

Plans from $17/month.

No setup fees. No annual contract. First analysis free, bring resumes you've already screened and compare.

Starting at
$17 / mo - Launch - 2 posts/mo - 200 resumes per role

Built for founders and small teams that hire occasionally. Scale plan ($39/mo) covers continuous hiring; Enterprise adds custom volume, with SSO and ATS Bridge on the roadmap.

Comparable AI-screening tools charge $0.10-$5 per resume; we land at $0.02-$0.04. A full-stack ATS (Greenhouse, Lever, iCIMS) starts at $300-$1,400/month and focuses on tracking applicants, not reading them. We complement those tools.

See pricing & plans
Common questions

The things every recruiter asks first.

Will this replace our recruiter?

No. ATS Pal does the part recruiters dread, reading every resume the same way, on a tight clock, so recruiters can spend their time on the candidates worth talking to. Decisions, conversations, and judgment calls stay where they belong: with your team.

Do we have to switch ATS?

No. Keep Greenhouse, Lever, Workable, BambooHR, or whatever you use. ATS Pal complements it, you can paste resumes from your ATS in seconds, or wire it up properly with the ATS Bridge on Enterprise.

How accurate is it?

In our benchmarks, our rankings agreed with what experienced recruiters and hiring managers picked 94.7% of the time. The honest test: try it on resumes you've already screened and compare.

Are resumes ever shared or used to train models?

Never. Resumes are processed strictly to produce your analysis, not shared with third parties, not used to train anyone's models, not held longer than you need. See Security for the full picture.

Read the full FAQ →

Our commitments

Resumes never shared Not with third parties, not for AI training.
AES-256 in Google Cloud Encryption at rest plus TLS 1.2+ in transit.
94.7% match with experts Our rankings agree with experienced recruiters.
5 minutes to first result No IT, no migration, no contract.

Try it on resumes you've already screened.

The fastest way to know if ATS Pal works for your team is to compare its ranking with yours. First analysis is free.

Start free, no card required

No credit card. No setup. Roughly 2 minutes from sign-up to your first ranked shortlist.

Prefer a walkthrough first? Book a 30-min call →